First phase of electrical upgrade completed!

We completed the first major milestone today. The first phase of the electrical upgrade: addition of circuits and service panel upgrade is done! We doubled (or quadrupled? I don’t remember…) the electrical capacity. We added dedicated circuits to the bathrooms (left the existing one; added one for the new space heater and one for the outlets), 3 or 4 in the kitchen (see left picture) and spread a few others throughout the house. All rooms have ceiling lights (original Eichlers had very few of these). And all outlets throughout the house are now grounded!

exposed Eichler's roof

The roofers have already started installing the insulation - you can see it on the right picture. Some rigid insulation, on top of which they will lay the Duro-Last, a single-ply membrane, also called “pool liner” (because that was the first usage for that material).

The kitchen is going down!

I finally got my hands dirty for the first time on this house (and not the last time I’m afraid)!

I tore down the kitchen during the long 4th of July. There’s no arguing that demolition is the most dangerous phase of remodeling. So I strongly recommend you pick up that book and follow their safety recommendations. My brand new safety glasses are already chipped - glad it’s them and not my eyes!

The kitchen cabinets were all nailed to the walls - impossible to remove them without messing up everything. Fortunately I had no intention to save the walls as I needed to expose the studs for the electrical upgrade. My technique was to chop everything in small parts and disassemble using the crowbar. The reciprocating saw is great for that. With a demolition blade it cuts through everything: wood and embedded nails, concrete and chicken wire (holding the tiles around the sink).

I almost killed myself when bringing down the cabinets that were hanging over the stovetop: they came down in one piece. And it was heavy - we’re not talking MDF here, it was thick plywood.

As for the tiles, it wasn’t that bad. Whoever laid them did a very sloppy job and didn’t bother removing the underlying linoleum. Don’t ever do this - mould was growing in between those multiple layers. Not pretty - you wouldn’t want to know that something like this exists in your kitchen…

Removing the AC unit from the wall was very painful. There again, everything was nailed (ever heard of screws?!), with rusted metal flanges inserted between the studs and the drywall sidings. No good grip to remove this in one go. Had to chop using the reciprocating saw - and a metal blade this time.

Isn’t this bare kitchen a beautiful sight? I must say that I was quite proud of myself when I eventually got the last bucket of dust out of this kitchen!

Count at least two full days to reach the studs and the concrete slab (OK, I might be slow - remember, I’m not a professional!).

First impressions (kitchen)

Let’s go inside. Everything had been carefully prepared for the sale with a gorgeous cream paint all over the house, and the infamous brown carpet. All this tastefully complimented by victorian brass light fixtures, six-panel doors and assorted door handles. Oh. My.


is that a kitchen where is the thermador

But where did my Thermador go?!